现在的位置: 首页 > 综合 > 正文

The BM’s work load

2012年06月25日 ⁄ 综合 ⁄ 共 1045字 ⁄ 字号 评论关闭
   I think the BM's work load is hard now. The build job is really a time killer.

Tuesday, I do a test about multi-shadow with a variant. I do many collateral work for shorten test time.

I tested two variant,

the first variant have a normal shadow, and I manully created another shadow for the variant. then do build and lint check at the same time.(over one hour)

I created two shadows workarea for the second variant. then do build and lint check at the same time.(one ahd half hour).

I skiped over the hard ware test because I haven't the hard ware.

Do contsync for the four variant ( parallel )use 2 hours, build use 3 hours.  So the test use time about  6 hours. That day , I was over time until 10:38 pm. when I left, another test building still running.

If BM only check two variant everyday, use two shadow worarea to shorten build time, he totally need 4  hours.

If we build failed, then we should chek the log, let developers change code. build again. it will use more than 4 hours.perhaps 8 or ?

one day if we only check two variants , may be the build manager can promote a baseline. but if he had to check more variants, and he only have one computer, it is really hard. time is limited.

if we have 6 variant to test.........and if they build failed at first............

抱歉!评论已关闭.